
The subfloor is the floor under your floor: the concrete, screed, floorboards or chipboard that the new flooring sits on. It decides how flat the new floor looks, whether it creaks, and how long it lasts. It is also the thing most likely to make a quote higher than you expected, so we would rather explain it properly here than surprise you on the day.
Marek does most of our preparation work. Read why subfloors matter for the longer version.
What we look for
On concrete and screed: moisture, cracks, hollow-sounding patches, old adhesive, and how flat the floor is over a two-metre straight edge.
On floorboards: loose, squeaky or springy boards, gaps between boards, raised nail heads, boards that have cupped, and old patches where pipes or cables have been run.
On chipboard (common upstairs in newer houses): swollen edges where water has got in, often near bathrooms, and panels that flex.
What we do about it
Moisture testing
New concrete takes months to dry, and older solid floors may have no damp-proof membrane at all. Resilient floors such as LVT and vinyl should go on a subfloor below 75% relative humidity, and wood needs it drier still. We test with a hygrometer before quoting for a hard floor on concrete. If the floor is too damp, we apply a surface damp-proof membrane, which is a liquid coating that stops moisture coming up, and quote for it after the test.
Plywood overlay on floorboards
Thin floors such as glue-down LVT and sheet vinyl will show the lines of floorboards through them in time. For these we screw down a layer of plywood over the boards, which gives a flat, stable surface. We screw down loose boards first, and leave access panels over pipes or stopcocks if you need them. We quote for this after the measure.
Smoothing compound
Smoothing compound (often called latex or self-levelling compound) is poured over the floor and finds its own level, leaving a smooth surface a few millimetres thick. It fills small dips, covers old adhesive residue that can't be scraped off, and gives glue-down LVT and vinyl a surface to stick to. It needs to dry before the new floor goes down, usually for a day. Our guide price is £14 to £20 per square metre depending on the depth needed and the primer the floor needs.
Fixing what is loose
Loose and squeaking floorboards are screwed down before carpet goes on. It is quick, and it is much easier now than after the carpet is fitted.
Why it is priced separately
Two floors of the same size can need very different amounts of preparation. Listing it on its own line means you can see where the money goes, and compare quotes properly. Where we couldn't see the subfloor at the measure because the old floor was still down, our quote says what we have assumed and what it would cost if more is needed.
What happens if we find something on the day
We stop and show you. If it is small, such as a few loose boards, we sort it there and then. If it would add to the price, we tell you what it is and how much, and you decide whether we carry on or come back.
Manufacturer warranties
Most flooring manufacturers' warranties depend on the floor being laid on a subfloor that meets their requirements. Skipping the preparation to save money can mean losing the warranty, which is another reason we won't lay a hard floor on a subfloor we don't think is fit for it.