Showroom open today until 5pm Unit 2, Lockyard Lane, Banbury · 01632 960 418
Tredwell & DaughterCarpets and flooring, Banbury Book a free measure

Home / How it works

How it works

What happens from your first visit to the day the floor goes down, and what we need from you at each step.

Most of the problems people tell us about from other fitters come down to something nobody mentioned before fitting day: the door that no longer closes, the wardrobe that couldn't be moved, the floor that needed levelling. This page is our attempt to mention all of it in advance.

1. The showroom

You are welcome to come in without an appointment during opening hours. We have carpet on stands and on the roll, LVT, laminate and engineered wood boards laid out on the floor so you can walk on them, and sheet vinyl samples.

Take samples home. Colours look very different under showroom lights than they do in a north-facing bedroom at four o'clock in the afternoon. Most samples can be borrowed for a week, and some small cut samples you can keep.

It helps if you bring rough room sizes, a photo or two of the room, and anything you are trying to match, such as a cushion or a paint chart.

If you can't get to us, we can bring a selection of samples to your home when we come to measure. Tell us roughly what you are looking for when you book, so we bring the right ones.

2. The free home measure

One of us, usually Keith, will come to your home at a time that suits you. Measures are Monday to Saturday during our opening hours, and on Tuesday and Thursday evenings until 7pm. The visit takes 30 to 60 minutes depending on the number of rooms. There is no charge and no obligation to order.

During the measure we will:

  • measure each room, the doorways and any stairs and landings
  • work out how the roll or boards will be laid, and show you where any joins in carpet will fall
  • look at what is under your current floor as far as we can (we may lift a corner of carpet if you are happy for us to)
  • take a moisture reading on concrete floors where we are quoting for a hard floor
  • look at your doors and tell you which ones will need trimming
  • ask about furniture and anything that can't be moved
  • check access, parking and where the van can go

What we can't always see is the floor underneath your existing floor. If the old carpet is still down, we can judge the floorboards or concrete only in the places we can reach. We will tell you on the quote what we have assumed, and what it would cost if more preparation turns out to be needed.

3. Your quote

You will have a written quote by email within two working days of the measure. Each item is listed separately:

  • the flooring, with the product name and the quantity including wastage
  • underlay, gripper, door bars and trims
  • fitting
  • stairs, if there are any
  • subfloor preparation, if it is needed
  • taking up and disposing of the old floor, if you want us to

The quote is valid for 30 days. If you want to change anything, ring or email Hannah and she will send a revised one.

4. Ordering and booking a date

When you are ready to go ahead, we take a 30% deposit and order your flooring. You pay the rest when the job is finished. We take card or bank transfer.

Most carpets are fitted within one to two weeks of ordering. Floors that are ordered in from the manufacturer usually take one to three weeks to arrive, and we book your fitting date once we know the delivery date. October to mid-December is our busiest time of year. We publish our last date for fitting before Christmas each autumn.

We will confirm your fitting date by email and text, and send a reminder the day before.

5. Before fitting day: what we need from you

  • Empty the room as far as you can. We move ordinary furniture such as beds, sofas, chests of drawers and tables at no extra cost, but please empty drawers, wardrobes and bookshelves first. We can't move plumbed-in or wired appliances, pianos, gym equipment, fitted furniture or very heavy wardrobes. If something can't be moved, tell us at the measure and we will work round it or plan another way.
  • Take down anything fragile. Ornaments, pictures near the floor, and anything on top of furniture we are moving.
  • Unplug and move small electricals. Lamps, chargers, computers and their cables.
  • Decorate first. If you are painting skirting boards or walls, do it before we fit, not after.
  • Clear a path. From the front door to the room, so we can carry rolls and boards in without catching anything.
  • Parking. A space on the drive or right outside helps a great deal. Carpet rolls are heavy, and 4m and 5m rolls need room to unload.
  • Pets and children. Keep them out of the room while we work. There are knives, staples and gripper strips with sharp pins.
  • Wood floors. If you are having engineered or solid wood, we will deliver it a few days early to acclimatise in the room. Please leave the boxes flat and unopened in the room where it will be fitted.
  • Underfloor heating. If you have it, turn it down or off as we advise when we confirm your date. We'll tell you what to do for your floor type.

6. Fitting day

The first job of the day is booked for an 8am to 9am arrival. If you are later in the day, the fitters will ring when they are on their way.

On the day we will:

  1. Protect the hallway and stairs with dust sheets where we are carrying things through.
  2. Take up and bag the old flooring, if this is on your quote, and remove old gripper, staples and nails.
  3. Carry out any preparation work on the floor. If we find something we didn't expect, we stop and show you before doing any extra work.
  4. Lay the underlay and the new floor.
  5. Take off any standard internal doors that need trimming, trim them and re-hang them. We don't cut fire doors, because doing so can affect their fire rating. If a fire door needs adjusting, you will need a carpenter, and we will have mentioned this on your quote.
  6. Fit door bars, thresholds and trims.
  7. Put the furniture back, take away all offcuts and packaging, and vacuum the room.

A typical bedroom carpet takes two to three hours. A staircase and landing takes most of a day. A kitchen in glue-down LVT can take two days if the floor needs smoothing compound first, because it has to dry before the floor goes down.

Before they leave, the fitters will walk round the job with you. If there is anything you are not happy with, say so then and there, and we will sort it.

7. After fitting

  • Carpet: you can walk on it straight away. Expect some loose fibres for the first few weeks. Vacuum regularly and they will settle. Any tufts that stand up can be trimmed level with scissors. Don't pull them.
  • Glue-down LVT: keep heavy furniture off it for 24 hours and don't wash it for 48 hours, so the adhesive can set.
  • Click LVT and laminate: usable straight away.
  • Wood: follow the care sheet we leave you. If you have underfloor heating, bring it up slowly, as we describe on the sheet.

We will call or text a few days later to check everything is as it should be. If you notice a problem at any point, ring us on 01632 960 418, email hello@tredwellanddaughter.example, or use the aftercare request form. Our fitting is guaranteed for two years from the fitting date when we have supplied and fitted the floor.