When people query a quote, it is usually the subfloor preparation line. They have chosen a floor, they know roughly what it costs per square metre, and then there is another figure for something they can't see and didn't ask for. It is a fair question, so here is the long answer.
What a subfloor is
The subfloor is whatever your new floor will sit on. In most houses round here that is one of four things:
- Concrete or sand and cement screed, usually downstairs in houses built from the 1950s onwards, and in almost all new houses.
- Floorboards on joists, upstairs in older houses and downstairs in many houses built before the war.
- Chipboard or OSB sheets on joists, upstairs in most houses built since the 1980s.
- An existing hard floor, such as old quarry tiles, ceramic tiles or old vinyl, which may or may not be suitable to go over.
Each one has its own common problems.
Why thin floors are fussy
A carpet with a good underlay will hide a lot. Small dips, the edges of floorboards and the odd raised nail head disappear under 10mm of underlay and a thick pile.
Thin floors hide nothing. Glue-down LVT is often only 2mm to 3mm thick, and sheet vinyl thinner. Laid straight onto floorboards, the edges of every board will show through as lines within a few months, especially where light comes across the floor from a window. A grain of grit left under glue-down LVT will eventually show as a pimple. A dip in a screed will show as a shadow, and the plank over it may not stick properly.
Floating floors such as laminate, click LVT and engineered wood are more forgiving, because they bridge small hollows. But if the floor is not flat enough, the boards flex as you walk on them. The joints then wear, can open up or creak, and in the worst cases the locking edges break.
The problems we find most often
Damp concrete. This is the big one for hard floors. A new concrete floor needs a long time to dry out, often many months, and a newly laid screed under a new extension is often still wet when the owners want to put a floor on it. Older solid floors in cottages and Victorian terraces sometimes have no damp-proof membrane at all. Resilient floors like LVT and vinyl should go on a floor below 75% relative humidity, and wood needs it drier still, around 65%. Lay a floor on a wet slab and the adhesive can fail, the vinyl can lift, wood can cup and mould can grow underneath. We test concrete floors with a hygrometer before we quote for a hard floor. If it is too damp, we put down a surface damp-proof membrane, a liquid coating that stops moisture coming up into the new floor.
Uneven or loose floorboards. Old boards cup, shrink and lift over the years, and they get taken up and put back badly when pipes and cables are run. Before carpet goes down, we screw down loose and squeaking boards. Before a thin hard floor goes down, we usually fit a plywood overlay screwed to the boards, which gives a flat, stable surface and stops the board lines showing through.
Swollen chipboard. Upstairs in newer houses, chipboard near bathrooms and en-suites has often had water on it at some point. The edges swell and stay swollen. Small areas can be sanded flat. Badly damaged panels need replacing, which may need a joiner.
Old adhesive. When old vinyl or carpet tiles come up, they leave adhesive behind. Some can be scraped off, and the rest has to be covered with smoothing compound before anything new can be glued down. Black, tar-like adhesive under old floor tiles in older houses needs care, because some old adhesives and tiles contained asbestos. If we find it, we stop and talk to you before anything is disturbed.
Dips and humps in screed. Screeds are rarely perfectly flat. We check with a two-metre straight edge. Most floors need a coat of smoothing compound before glue-down LVT or vinyl, which leaves a smooth, flat surface a few millimetres thick.
What it costs and why it is a separate line
Our guide price for smoothing compound is £14 to £20 per square metre, depending on how deep it needs to be and which primer the floor needs. Plywood overlays and damp-proof membranes we price after seeing the floor, because they vary so much.
We put preparation on its own line so you can see what you're paying for and compare quotes fairly. A cheaper quote for the same floor sometimes simply leaves the preparation out. On a glue-down LVT job, preparation can cost as much as the fitting itself, so it is worth asking any fitter what they are planning to do about the subfloor.
Why we couldn't always tell you at the measure
When the old floor is still down, we can only see the subfloor in the places we can reach, such as a corner of carpet we lift with your permission, or a gap by a radiator pipe. On concrete we can test for moisture through a small area. We'll write on your quote what we have assumed, and what it would cost if the floor turns out to need more.
If we find something on the day that changes the price, we stop and show you. If it is small, such as a few loose boards, we sort it there and then without charge. If it is more than that, you decide whether we go ahead.
What happens if it is skipped
Sometimes people ask us to leave the preparation out to keep the price down. For carpet on reasonably sound boards, that is usually fine, and we'll say so. For thin hard floors, we won't lay a floor on a subfloor we don't think is fit for it. Partly that is because we guarantee our fitting for two years, and partly because most manufacturers' warranties depend on the floor going down on a properly prepared subfloor. If the floor fails because the base was wrong, the manufacturer is unlikely to help, and you will have paid for a floor twice.
If the budget is tight, we'd rather suggest a different floor that suits the subfloor you have, such as a click LVT or a cushioned vinyl, than lay the wrong one badly.